Posted on: May 23rd, 2022 by trolland

SPS HVAC Design RFQ, SPS-HVAC-Design-RFQ.pdf (0.1 MiB)
Posted on: February 14th, 2022 by trolland

SHS Boiler Replacement Bid Opening 2-11-22 - Sheet1, SHS-Boiler-Replacement-Bid-Opening-2-11-22-Sheet1.pdf (47 KiB)
Posted on: February 7th, 2022 by trolland

Boiler Replacement Addendum 2, Boiler-Replacement-Addendum-2.pdf (0.2 MiB)
Posted on: February 2nd, 2022 by trolland

Boiler Replacement Questions (2), Boiler-Replacement-Questions-2.pdf (44 KiB)
Posted on: February 2nd, 2022 by trolland

Boiler Repl Walk Through Sign In 2-1-22, Boiler-Repl.-Walk-Through-Sign-In-2-1-22.pdf (55 KiB)
Posted on: February 1st, 2022 by trolland

Boiler Replacement Addendum #1, Boiler-Replacement-Addendum-1.pdf (0.2 MiB)
Posted on: January 24th, 2022 by trolland

01.2022 Somers High School Boiler Replacement Drawings, 01.2022-Somers-High-School-Boiler-Replacement-Drawings.pdf (2.3 MiB)
Posted on: January 24th, 2022 by trolland

01.2022 Somers High School Boiler Replacement RFP, 01.2022-Somers-High-School-Boiler-Replacement-RFP.pdf (0.7 MiB)
Posted on: January 24th, 2022 by trolland

SHS Boiler Replacement RFP Summary, SHS-Boiler-Replacement-RFP-Summary.pdf (6 KiB)